top of page

Consumer Unit, Switchboard or Fuse Box: Same Thing, Different Words

Kris Goff
Sep 21
3 min read

Short answer: consumer unit is the British word for what New Zealanders call a switchboard. Same piece of equipment. If you have been searching "consumer unit upgrade" and getting UK prices and UK regulations, that is why — the rules here are AS/NZS 3000, not the British wiring regs.

The words, sorted

  • Switchboard — the standard New Zealand term. The panel holding your main switch and the protective devices for each circuit.

  • Consumer unit — British English for the same thing. Understood here, not what a local sparky will write on the invoice.

  • Fuse box — usually means an *old* board with rewirable ceramic fuses rather than circuit breakers. If this is genuinely what you have, it is the one worth acting on.

  • Distribution board (DB) — the term used on commercial and industrial sites, and for sub-boards feeding part of a building.

  • Sub-board — a smaller board fed from the main one, common for a shed, sleepout or extension.

  • Meter box — the enclosure on the outside wall holding the meter. Sometimes the switchboard lives in it, sometimes not. The meter belongs to your retailer, the board belongs to you.

How to tell what you have

  1. Ceramic fuses — porcelain holders you pull out, with fuse wire inside. Oldest, and the one insurers ask about.

  2. Plug-in fuses — cartridge type. Still old.

  3. Circuit breakers (MCBs) — switches you flick back up. Better, but on their own they protect the wiring, not you.

  4. RCD or RCBO protection — this is the one that protects people by cutting power on an earth fault. If you have no RCD protection, that is the real gap, regardless of what the board looks like.

Press the test button on any RCD you do have. It should trip immediately. If nothing happens, it is not protecting anyone.

Why the British answers do not apply here

New Zealand wiring works to AS/NZS 3000. Prescribed electrical work here gets a Certificate of Compliance, and mains-level work gets a Record of Inspection as well — see CoC, ESC and RoI. UK guidance about 18th Edition, EICRs and Part P is not the standard your house is held to, and UK pricing is not our pricing.

So which upgrade do you actually need?

  • Board only — the board is old or full but the mains cable feeding it is sound and adequately sized.

  • Board and mains — the supply cable itself is undersized or perished. More work, and it brings the lines company into it.

  • Board plus a sub-board — where a shed, sleepout or extension needs its own protection.

What drives the price is covered in what a switchboard upgrade costs in the Waikato, and if the mains are involved see which lines company covers your address.

Questions we get asked

Is a consumer unit upgrade the same as a switchboard upgrade?

Yes. Different word, same job.

Do I have to upgrade if the old board still works?

There is no law forcing it on an existing house. But ceramic fuses and no RCD protection are an insurance conversation and a safety one, and RCD protection is the cheapest safety improvement per dollar available.

Who owns the meter?

Your retailer. The board and everything past it is yours. The cable from the street to the point of supply belongs to the lines company.

Can you look at it without committing to work?

Yes. Send a photo of the open board to start with — that answers most of it before anyone drives anywhere.

Not sure what you have got?

Text a photo of your board to Kris on 021 466 666 and we will tell you what it is and whether it needs anything. See the mains and switchboards page.

Recent Posts

See All

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page