Body Corporates: Who Pays for the Electrical Work?
Short answer: almost every body corporate electrical dispute is really a boundary question — is the thing that failed common property, or is it inside the owner's unit? Under the Unit Titles Act the body corporate is responsible for common property and the owner for their own unit. Get the boundary right and the payment question usually answers itself.
We are not lawyers, and the exact boundary is set by your unit plan and your body corporate's own rules. But in practice most cases are clear, and this is how they usually fall.
Usually common property
Lighting in corridors, stairwells, lobbies and lift areas.
Car park and basement lighting, and any car park ventilation supply.
External and perimeter lighting, including path and security lighting.
The main switchroom, main switchboard and the distribution feeding common areas.
Supply to shared services — pumps, gates, intercoms, ventilation.
Emergency and exit lighting in shared escape routes.
The cabling running between units, where it serves the building rather than one unit.
Usually the owner
Everything inside the unit boundary — outlets, switches, light fittings, the unit's own board.
Appliances and anything the owner or tenant installed.
Smoke alarms inside the unit, though check your rules because some schemes manage these centrally.
Any alteration an owner made, whether or not it was approved.
The grey areas that cause arguments
The unit's submain. The cable running from the main board to an individual unit's board. Where the boundary falls on that run is exactly the thing your unit plan decides, and it is worth knowing before it fails rather than after.
A common-area fault caused by something in a unit. The repair may be common property; the cost may still be recoverable.
Metering. Where units are not individually metered, or where a common meter is picking up load that belongs to a unit.
Historic unapproved work. An owner's alteration that has been there for fifteen years is still the owner's alteration.
EV charging in the car park. Rapidly becoming the most common question — it is a common property supply question, a capacity question and a cost-allocation question all at once.
What a committee should have on file
A current board schedule and labelling for the main switchboard and any sub-boards. Most buildings have neither.
Testing records for emergency and exit lighting.
RCD testing records for common-area circuits.
Certificates of Compliance for every piece of electrical work done on common property. See CoC, ESC and RoI.
A long-term maintenance view of the electrical assets, because switchboards and emergency lighting both have finite lives and both fail expensively when unplanned.
Budgeting for it
Electrical work in a body corporate splits into three predictable buckets: scheduled testing that recurs annually, reactive repairs that will happen whether or not they are budgeted, and capital replacement of ageing distribution and lighting.
The first is small and controllable. The third is large and forecastable if somebody looks. It is the middle bucket that wrecks budgets, and it shrinks when the first is done properly. That is the argument for a maintenance arrangement rather than ad hoc call-outs — see what a maintenance retainer actually covers.
Questions we get asked
Can you invoice the body corporate and the owner separately on one visit?
Yes, provided we agree the split before we start. That means identifying on site what is common property and what is not, and getting it confirmed by whoever has authority.
Who decides the boundary if it is disputed?
Your unit plan and body corporate rules, and where it stays contested, your body corporate manager or a lawyer. We will tell you what we found and where it physically sits — the legal call is not ours.
Can you attend an AGM or put together a maintenance schedule?
We will put a written schedule and indicative costs together for a committee to work from. That is usually more useful than attending, and it can go in the agenda papers.
What about EV charging in the car park?
Start with what the building's supply can actually carry, because that determines everything else. See EV readiness and when a property needs three-phase.
Get the common property assessed
Call Kris on 021 466 666. We cover the Waikato and South Auckland from Waerenga — see the commercial repairs and maintenance page.