EV Readiness: Wiring the House Now, Fitting the Charger Later

Kris Goff
Sep 21
3 min read

Short answer: EV readiness means doing the expensive, disruptive part now — the cable route, the circuit and the spare capacity at the switchboard — so that fitting the actual charger later is a short job instead of a renovation. It is the single cheapest thing you can do for a car you have not bought yet.

Readiness versus installation

  • EV readiness — cable run from the switchboard to where the car will park, a spare way kept at the board, and the load checked. No charger fitted.

  • EV charger installation — the charger itself mounted, connected, commissioned and certified.

If the walls are open, or the driveway is dug up, or the board is being replaced anyway, readiness costs very little on top. Retrofitting the same cable later means opening a wall, patching, stopping and repainting.

What an EV readiness install involves

  1. Load assessment. Can the existing supply carry a charger on top of what the house already draws? This is the question that decides everything else.

  2. Board capacity. A spare way reserved, and RCD protection appropriate for the circuit.

  3. Cable route and size. From the board to the park position, sized for the distance as well as the load — a long run to a detached garage needs a bigger cable than the current alone would suggest.

  4. Termination. Left safely terminated and labelled at both ends, ready to pick up.

  5. Certification of the work done. The circuit installed now is prescribed electrical work and gets certified now.

When readiness is obviously worth it

The load question, honestly

Most New Zealand homes on a standard single-phase supply can run one home charger, often with load management so the charger backs off when the oven and the hot water are both going. What catches people is a house that already has a heat pump, an induction hob and instant hot water — that supply may be closer to its limit than anyone has checked.

It is rarely a reason to go three-phase for a single charger. It can be for a depot with several. See when a property actually needs three-phase.

Questions we get asked

Can I just use the plug that came with the car?

For occasional top-ups on a sound, dedicated socket, yes. As a daily charging method on an old circuit shared with half the house, it is a heat risk. Get the circuit checked before relying on it.

How long does readiness take?

Usually part of a day for a straightforward run, less if it is bundled into work already happening.

Which charger should I buy?

Decide the car first, then the charger, then have us confirm the supply suits. We install what you choose rather than pushing one brand.

Do you do commercial and fleet?

Yes — multiple points, load management and the lines company application where capacity needs lifting. See which lines company covers your address.

Get the house EV ready

Call Kris on 021 466 666. Tell us where the car parks and where the board is, and we will tell you what it takes.

Recent Posts

See All
What Does an Electrician Cost in the Waikato?

Most Waikato electricians charge an hourly rate plus materials plus a vehicle charge, or a fixed price once they have seen the job. Here is how a bill is actually built up, what a call-out really cove

 
 